2020 Sewer Pipe Repair and Replacement Project, Phase 2

The project consists of repairing and replacing approximately 12,000 LF of (6" to 21") pipe in various locations by open trench and pipe burst. Work also includes lateral and manhole replacement, paving and striping.
Addendum 1 (click to expand/collapse)
Name Size
Addend-1_070822 596.5 KB
Addendum 2 (click to expand/collapse)
Name Size
San RafaelSewerImprvProj_Addend-2_072222 1.5 MB
Addendum 3 (click to expand/collapse)
Name Size
San RafaelSewerImprvProj_Addend-3_072622 966.3 KB
Addendum 4 (click to expand/collapse)
Name Size
San RafaelSewerImprvProj_Addend-4_072722 98.4 KB